A room dedicated to grinding and finishing metal work projects.Metal Chop Saw with CabinetMetal Band SawForge Furnace has moved to front of Annexed Suite 127 to make it easier to move hot stuff work outside.MIG Welder has moved to front of Annex 127 as well to help with hot stuff metal work outside.Welding Tanks are more conveniently located near Annex 127 Bay shop door.And of course the Anvil is much easier to move to the outside of Annex 127 for Blacksmith finishing of metal projects.Metal Shop floor space is not nearly as congested with the relocation of many of the metal work hot stuff equipment.More room to work when operating the JET combination equipment.More room to work when accessing the Lathe as well